Adiyaman
Antalya
Artvin
Elazig
Giresun
Gumushane
İzmir
Kayseri
Ordu
Rize
Trabzon
 
       
 
Completed Projects
TRABZON
Field of Activity Name and Location of Projects Name of Client
Intake System
  
Esiroğlu Drinking Water Intake Systems
Caisson Intake & Pump Station
Province Bank General Directorate
17. Division Directorate
Arsin Drinking Water Intake Systems
Caisson Intake & Pump Station
Province Bank General Directorate
17. Division Directorate
Doğanköy Drinking Water Intake Systems
Caisson Intake & Pump Station
Province Bank General Directorate
17. Division Directorate
Drinking Water
Beşirli Water Facility Structures
ø150 Pvc Pipe, 4500 m, Water Storage Depot 500 m³
Province Bank General Directorate
17. Division Directorate
Telecomunication works
Besikduzu and Cukurcayır Fiber Optic Cable
Sub Structure Works
9- Hole Capacity; Total Lenght of 17500 m.
ERE Energy Co.
Telecommunication Division;
Subcontractor
Bridges
Trabzon-Erzurum State Highway
DEGIRMENDER 12 Mass Concrete Hydraulic Bridge Lenght: 22 m
General Directorate of Highways
10. Division Directorate
Trabzon-Erzurum State Highway
DEGIRMENDERE 15 Mass Concrete Centilever
Hydraulic Bridge
Total Lenght: 49 m
General Directorate of Highways
10. Division Directorate
Trabzon-Erzurum State Highway
DEGIRMENDERE 20 Mass Concrete Hydraulic Bridge Lenght: 22 m
Polat Road Construction Co.
(General Directorate of Highways
10. Division Directorate; Subcontractor)
Trabzon-Erzurum State Highway
DEGIRMENDER 20 Mass Concrete Hydraulic Bridge Lenght: 22 m
Polat Road Construction Co.
(General Directorate of Highways
10. Division Directorate; Subcontractor)
Trabzon City Center Overpass Birdge Construction
Mass Concrete, 5-Span, Total Lenght of 95 m.
General Directorate of Highway
10. Division Directorate